Project Profile: 20 The Boltons, Chelsea

Client
Capital Interiors Ltd.
Date of completion
January 2016
Value
£4.5m
Reinforced Concrete Basement
Reinforced Concrete Basement

Scope of works

 

  • Secant and contiguous piling

  • Excavation and temporary shoring to create a 12m deep basement

  • Drainage

  • Reinforced concrete works

Reinforced Concrete Basement

Project key points

 

  • Design and build to create a 12m deep basement including swimming pool adjacent to listed structures

  • Logistically challenging site with no 'drive in' access to the site

  • Front basement 5.5m deep constructed in top-down to assist with logistics

  • Part of the rear basement constructed in top-down fashion to allow early construction of the above ground structure