Client
Bouygues UK
Date of completion
June 2017
Value
£7.8m
Full Case Study Download
Scope of works
-
Reinforced concrete basement
-
Demolition
-
Façade retention
-
Temporary works
-
Piling
-
Structural steelworks
-
Underpinning
Key project points
-
Construction of 6.8m and 7.5m deep basement in a top down manner, using 600mm and 450mm diameter contiguous and temporary / permanent piles
-
Design and installation of all temporary works schemes including façade retention, temporary steel propping and bored piles to build new basement
-
Demolition / rebuilding of reinforced concrete stair core while retaining existing structure
-
Adjacent to Regents Park
-
A Grade II listed building, part of the Crown Estate