Project Profile: Cambridge Terrace, NW1

Client
Bouygues UK
Date of completion
June 2017
Value
£7.8m
Full Case Study Download
Reinforced concrete basement and demolition
Reinforced concrete basement and demolition

Scope of works

 

  • Reinforced concrete basement

  • Demolition

  • Façade retention 

  • Temporary works 

  • Piling

  • Structural steelworks

  • Underpinning

Reinforced concrete basement and demolition

Key project points

 

  • Construction of 6.8m and 7.5m deep basement in a top down manner, using 600mm and 450mm diameter contiguous and temporary / permanent piles

  • Design and installation of all temporary works schemes including façade retention, temporary steel propping and bored piles to build new basement 

  • Demolition / rebuilding of reinforced concrete stair core while retaining existing structure

  • Adjacent to Regents Park

  • A Grade II listed building, part of the Crown Estate