Project Profile: Kings Cross

Client
Bam Construction Limited
Date of completion
March 2017
Value
£5.4m
RC Basement And Two-Storey Slip-formed RC Cores
RC Basement And Two-Storey Slip-formed RC Cores

Scope of works

 

  • Sheet piling

  • RC basement and two-storey slip-formed RC cores

 

RC Basement And Two-Storey Slip-formed RC Cores

Project key points 

 

  • Installation of sheet piles around the perimeter of building

  • Construction of capping beam and installation of propping steel

  • Basement excavation over 7m deep

  • Construction of basement raft slab 1.5m deep and RC liner-wall to front of sheet pile using water proof concrete

  • Installation of below ground drainage system

  • Construction of RC columns, mezzanine floor and ground floor

  • Slip-form two concrete cores 12 floors in height from basement level

  • Concrete to floor slab from 1st to 10th floor on composite floor decking